Status
Finished
Total time 3h42m57s
Finished at Sun 18 Oct 08:42:57
Effort today
Current Performance Index: 553
iTRA PI 469 · running 18% above career level — PB pace
Course profile 26 km · +1,641 m
START W0 A7 W2 FINISH
Position overall at each station (1st at the top, 247 at the bottom)
1st247th 36343734
START W0 A7 W2 FINISH
Position overall at each station (1st at the top, 247 at the bottom)
1st247th 36343734
Aid station schedule
START · 0.0 km ✓
out05:00:00
W0 · 9.9 km · Current PI 469 ✓
36th overall · 32nd male
Section time 1h42m44s · 10:23 /km
Section 9.9 km · +1065 / −426 m
expected at07:02 cut-off at08:40
in06:42:44
19 min FASTER than expected
Section PI 550 — going harder than career
A7 · 14.8 km · Current PI 525 ✓
34th overall · 31st male (▲ up 2)
Section time 31m21s · 6:24 /km
Section 4.9 km · +134 / −475 m
expected at07:14 cut-off at09:50
in07:14:05
0 min FASTER than expected
Section PI 619 — way above career, blow-up risk
W2 · 20.6 km · Current PI 574 ✓
37th overall · 34th male (▼ down 3)
Section time 50m54s · 8:47 /km
Section 5.8 km · +309 / −309 m
expected at07:59 cut-off at11:30
in08:04:59
4 min SLOWER than expected
Section PI 507 — at career level
FINISH · 26.2 km · Current PI 496 ✓
34th overall · 31st male (▲ up 3)
Section time 37m58s · 6:40 /km
Section 5.7 km · +134 / −441 m
expected at08:45 cut-off at13:00
in08:42:57
2 min FASTER than expected
Section PI 570 — way above career, blow-up risk
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run