Status
Finished
Total time 4h31m49s
Finished at Sun 18 Oct 09:31:49
Effort today
Current Performance Index: 454
iTRA PI 412 · running 10% above career level — PB pace
Course profile 26 km · +1,641 m
START W0 A7 W2 FINISH
Position overall at each station (1st at the top, 247 at the bottom)
1st247th 65636969
START W0 A7 W2 FINISH
Position overall at each station (1st at the top, 247 at the bottom)
1st247th 65636969
Aid station schedule
START · 0.0 km ✓
out05:00:00
W0 · 9.9 km · Current PI 412 ✓
65th overall · 51st male
Section time 1h58m45s · 12:00 /km
Section 9.9 km · +1065 / −426 m
expected at07:19 cut-off at08:40
in06:58:45
20 min FASTER than expected
Section PI 475 — going harder than career
A7 · 14.8 km · Current PI 456 ✓
63rd overall · 50th male (▲ up 2)
Section time 39m24s · 8:02 /km
Section 4.9 km · +134 / −475 m
expected at07:35 cut-off at09:50
in07:38:09
2 min SLOWER than expected
Section PI 493 — going harder than career
W2 · 20.6 km · Current PI 468 ✓
69th overall · 55th male (▼ down 6)
Section time 1h04m36s · 11:08 /km
Section 5.8 km · +309 / −309 m
expected at08:32 cut-off at11:30
in08:42:45
10 min SLOWER than expected
Section PI 399 — at career level
FINISH · 26.2 km · Current PI 403 ✓
69th overall · 54th male
Section time 49m04s · 8:36 /km
Section 5.7 km · +134 / −441 m
expected at09:31 cut-off at13:00
in09:31:49
0 min FASTER than expected
Section PI 441 — at career level
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run