Status
Finished
Total time 4h30m55s
Finished at Sun 18 Oct 09:30:55
Effort today
Current Performance Index: 455
iTRA PI 311 · running 46% above career level — PB pace
Course profile 26 km · +1,641 m
START W0 A7 W2 FINISH
Position overall at each station (1st at the top, 247 at the bottom)
1st247th 81757168
START W0 A7 W2 FINISH
Position overall at each station (1st at the top, 247 at the bottom)
1st247th 81757168
Aid station schedule
START · 0.0 km ✓
out05:00:00
W0 · 9.9 km · Current PI 311 ✓
81st overall · 18th female
Section time 2h06m53s · 12:49 /km
Section 9.9 km · +1065 / −426 m
expected at08:04 cut-off at08:40
in07:06:53
57 min FASTER than expected
Section PI 445 — way above career, blow-up risk
A7 · 14.8 km · Current PI 405 ✓
75th overall · 17th female (▲ up 6)
Section time 38m21s · 7:50 /km
Section 4.9 km · +134 / −475 m
expected at07:46 cut-off at09:50
in07:45:14
1 min FASTER than expected
Section PI 506 — way above career, blow-up risk
W2 · 20.6 km · Current PI 448 ✓
71st overall · 16th female (▲ up 4)
Section time 59m37s · 10:17 /km
Section 5.8 km · +309 / −309 m
expected at08:41 cut-off at11:30
in08:44:51
3 min SLOWER than expected
Section PI 433 — way above career, blow-up risk
FINISH · 26.2 km · Current PI 396 ✓
68th overall · 15th female (▲ up 3)
Section time 46m04s · 8:05 /km
Section 5.7 km · +134 / −441 m
expected at09:34 cut-off at13:00
in09:30:55
3 min FASTER than expected
Section PI 470 — way above career, blow-up risk
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run