Status
Finished
Total time 4h30m08s
Finished at Sun 18 Oct 09:30:08
Effort today
Current Performance Index: 456
iTRA PI 295 · running 55% above career level — PB pace
Course profile 26 km · +1,641 m
START W0 A7 W2 FINISH
Position overall at each station (1st at the top, 247 at the bottom)
1st247th 60666867
START W0 A7 W2 FINISH
Position overall at each station (1st at the top, 247 at the bottom)
1st247th 60666867
Aid station schedule
START · 0.0 km ✓
out05:00:00
W0 · 9.9 km · Current PI 295 ✓
60th overall · 13th female
Section time 1h56m56s · 11:49 /km
Section 9.9 km · +1065 / −426 m
expected at08:14 cut-off at08:40
in06:56:56
77 min FASTER than expected
Section PI 483 — way above career, blow-up risk
A7 · 14.8 km · Current PI 426 ✓
66th overall · 14th female (▼ down 6)
Section time 42m27s · 8:40 /km
Section 4.9 km · +134 / −475 m
expected at07:33 cut-off at09:50
in07:39:23
5 min SLOWER than expected
Section PI 457 — way above career, blow-up risk
W2 · 20.6 km · Current PI 409 ✓
68th overall · 14th female (▼ down 2)
Section time 1h01m55s · 10:41 /km
Section 5.8 km · +309 / −309 m
expected at08:33 cut-off at11:30
in08:41:18
7 min SLOWER than expected
Section PI 417 — way above career, blow-up risk
FINISH · 26.2 km · Current PI 380 ✓
67th overall · 14th female (▲ up 1)
Section time 48m50s · 8:34 /km
Section 5.7 km · +134 / −441 m
expected at09:30 cut-off at13:00
in09:30:08
matched expected pace
Section PI 443 — way above career, blow-up risk
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run