Status
Finished
Total time 7h09m06s
Finished at Sun 18 Oct 12:09:06
Effort today
Current Performance Index: 287
iTRA PI 250 · running 15% above career level — PB pace
Course profile 26 km · +1,641 m
START W0 A7 W2 FINISH
Position overall at each station (1st at the top, 247 at the bottom)
1st247th 225214203203
START W0 A7 W2 FINISH
Position overall at each station (1st at the top, 247 at the bottom)
1st247th 225214203203
Aid station schedule
START · 0.0 km ✓
out05:00:00
W0 · 9.9 km · Current PI 250 ✓
225th overall · 70th female
Section time 3h08m50s · 19:04 /km
Section 9.9 km · +1065 / −426 m
expected at08:49 cut-off at08:40
in08:08:50
40 min FASTER than expected
Section PI 299 — at career level
A7 · 14.8 km · Current PI 284 ✓
214th overall · 67th female (▲ up 11)
Section time 1h01m07s · 12:28 /km
Section 4.9 km · +134 / −475 m
expected at09:07 cut-off at09:50
in09:09:57
2 min SLOWER than expected
Section PI 318 — going harder than career
W2 · 20.6 km · Current PI 297 ✓
203rd overall · 63rd female (▲ up 11)
Section time 1h34m40s · 16:19 /km
Section 5.8 km · +309 / −309 m
expected at10:35 cut-off at11:30
in10:44:37
9 min SLOWER than expected
Section PI 273 — at career level
FINISH · 26.2 km · Current PI 266 ✓
203rd overall · 63rd female
Section time 1h24m29s · 14:49 /km
Section 5.7 km · +134 / −441 m
expected at12:00 cut-off at13:00
in12:09:06
8 min SLOWER than expected
Section PI 256 — at career level
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run