The dot is this runner. Numbers above the line = runners on each section right now.
Aid station schedule
START· 0.0 km ✓
out06:30:00
A7· 6.7 km ✓
282nd overall · 120th female
Section time 2h15m40s · 20:15 /km
Section 6.7 km · +626 / −332 m
cut-off at09:15
in08:45:40
Section PI 247
W2· 12.5 km
Section 5.8 km · +309 / −309 m
cut-off at11:15
FINISH· 18.2 km
Section 5.7 km · +134 / −441 m
cut-off at13:00
Current PI (Performance Index) blends how the runner is going right now with
their career score: about 70% their most recent section and
30% their career iTRA PI. It updates every section and is
the level we use to predict the next one. (Before the first section it's
just the career iTRA PI; a runner with no career PI uses their latest
section alone.)
Section PI is what that one section implies on its own —
that single leg's pace against the reference, ignoring the rest of the race.
Read either against the runner's career iTRA PI: a higher number means they
ran harder than their score predicts; lower means slower (tired, or pacing
on purpose).
Expected at is our predicted arrival at the next aid
station: its terrain-adjusted (“equivalent”) distance run at the
Current PI's pace, plus a small allowance for fade because runners slow
over a long day. It refreshes each time a section finishes.