Status
Finished
Total time 5h24m35s
Finished at Sat 08 Aug 10:54:35
Effort today
Current Performance Index: 703
iTRA PI 635 · running 11% above career level — PB pace
Course profile 43 km · +2,778 m
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 6787
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 6787
Aid station schedule
START · 0.0 km ✓
out05:30:00
HQ · 10.0 km · Current PI 635 ✓
6th overall · 6th male
Section time 1h28m26s · 8:51 /km
Section 10.0 km · +1116 / −123 m
expected at07:00 cut-off at09:00
in06:58:26out06:59:53
1 min FASTER than expected
Dwell 1 minute.
Section PI 718 — going harder than career
A1 · 20.3 km · Current PI 693 ✓
7th overall · 7th male (▼ down 1)
Section time 1h07m01s · 6:30 /km
Section 10.3 km · +323 / −1312 m
expected at08:07 cut-off at12:00
in08:06:54out08:07:25
0 min FASTER than expected
Dwell 1 minute.
Section PI 704 — going harder than career
HQ (2nd visit) · 31.2 km · Current PI 683 ✓
8th overall · 8th male (▼ down 1)
Section time 1h42m52s · 9:26 /km
Section 10.9 km · +1193 / −203 m
expected at09:52 cut-off at16:05
in09:50:17out09:51:26
2 min FASTER than expected
Dwell 1 minute.
Section PI 668 — at career level
FINISH · 42.9 km · Current PI 658 ✓
7th overall · 7th male (▲ up 1)
Section time 1h03m09s · 5:24 /km
Section 11.7 km · +147 / −1139 m
expected at11:22 cut-off at18:30
in10:54:35
28 min FASTER than expected
Section PI 740 — way above career, blow-up risk
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run