Status
Finished
Total time 6h27m41s
Finished at Sat 08 Aug 11:57:41
Effort today
Current Performance Index: 604
iTRA PI 524 · running 15% above career level — PB pace
Course profile 43 km · +2,778 m
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 18161514
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 18161514
Aid station schedule
START · 0.0 km ✓
out05:30:00
HQ · 10.0 km · Current PI 524 ✓
18th overall · 17th male
Section time 1h41m31s · 10:09 /km
Section 10.0 km · +1116 / −123 m
expected at07:19 cut-off at09:00
in07:11:31out07:14:18
7 min FASTER than expected
Dwell 3 minutes.
Section PI 626 — way above career, blow-up risk
A1 · 20.3 km · Current PI 595 ✓
16th overall · 16th male (▲ up 2)
Section time 1h16m21s · 7:25 /km
Section 10.3 km · +323 / −1312 m
expected at08:32 cut-off at12:00
in08:30:39out08:36:29
1 min FASTER than expected
Dwell 6 minutes.
Section PI 618 — going harder than career
HQ (2nd visit) · 31.2 km · Current PI 590 ✓
15th overall · 13th male (▲ up 1)
Section time 1h56m47s · 10:43 /km
Section 10.9 km · +1193 / −203 m
expected at10:36 cut-off at16:05
in10:33:16out10:37:51
3 min FASTER than expected
Dwell 5 minutes.
Section PI 588 — going harder than career
FINISH · 42.9 km · Current PI 569 ✓
14th overall · 13th male (▲ up 1)
Section time 1h19m50s · 6:49 /km
Section 11.7 km · +147 / −1139 m
expected at12:22 cut-off at18:30
in11:57:41
24 min FASTER than expected
Section PI 585 — going harder than career
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run