Status
Finished
Total time 7h35m57s
Finished at Sat 08 Aug 13:05:57
Effort today
Current Performance Index: 516
iTRA PI 472 · running 9% above career level — PB pace
Course profile 43 km · +2,778 m
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 36404335
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 36404335
Aid station schedule
START · 0.0 km ✓
out05:30:00
HQ · 10.0 km · Current PI 472 ✓
36th overall · 32nd male
Section time 1h55m12s · 11:31 /km
Section 10.0 km · +1116 / −123 m
expected at07:31 cut-off at09:00
in07:25:12out07:30:47
5 min FASTER than expected
Dwell 6 minutes.
Section PI 551 — going harder than career
A1 · 20.3 km · Current PI 528 ✓
40th overall · 34th male (▼ down 4)
Section time 1h37m41s · 9:29 /km
Section 10.3 km · +323 / −1312 m
expected at08:59 cut-off at12:00
in09:08:28out09:14:55
9 min SLOWER than expected
Dwell 6 minutes.
Section PI 483 — at career level
HQ (2nd visit) · 31.2 km · Current PI 480 ✓
43rd overall · 32nd male (▼ down 3)
Section time 2h17m00s · 12:34 /km
Section 10.9 km · +1193 / −203 m
expected at11:38 cut-off at16:05
in11:31:55out11:37:14
7 min FASTER than expected
Dwell 5 minutes.
Section PI 501 — at career level
FINISH · 42.9 km · Current PI 493 ✓
35th overall · 27th male (▲ up 8)
Section time 1h28m43s · 7:35 /km
Section 11.7 km · +147 / −1139 m
expected at13:41 cut-off at18:30
in13:05:57
35 min FASTER than expected
Section PI 526 — going harder than career
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run