Status
Finished
Total time 8h04m48s
Finished at Sat 08 Aug 13:34:48
Effort today
Current Performance Index: 474
iTRA PI 439 · running 8% above career level — PB pace
Course profile 43 km · +2,778 m
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 87635752
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 87635752
Aid station schedule
START · 0.0 km ✓
out05:30:00
HQ · 10.0 km · Current PI 439 ✓
87th overall · 68th male
Section time 2h17m00s · 13:42 /km
Section 10.0 km · +1116 / −123 m
expected at07:40 cut-off at09:00
in07:47:00out07:49:19
6 min SLOWER than expected
Dwell 2 minutes.
Section PI 464 — at career level
A1 · 20.3 km · Current PI 456 ✓
63rd overall · 48th male (▲ up 24)
Section time 1h40m17s · 9:44 /km
Section 10.3 km · +323 / −1312 m
expected at09:34 cut-off at12:00
in09:29:36out09:32:24
4 min FASTER than expected
Dwell 3 minutes.
Section PI 471 — at career level
HQ (2nd visit) · 31.2 km · Current PI 461 ✓
57th overall · 42nd male (▲ up 6)
Section time 2h20m02s · 12:51 /km
Section 10.9 km · +1193 / −203 m
expected at12:12 cut-off at16:05
in11:52:26out11:54:54
20 min FASTER than expected
Dwell 2 minutes.
Section PI 490 — going harder than career
FINISH · 42.9 km · Current PI 475 ✓
52nd overall · 40th male (▲ up 5)
Section time 1h39m54s · 8:32 /km
Section 11.7 km · +147 / −1139 m
expected at14:08 cut-off at18:30
in13:34:48
33 min FASTER than expected
Section PI 467 — at career level
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run