Status
Finished
Total time 8h45m20s
Finished at Sat 08 Aug 14:15:20
Effort today
Current Performance Index: 460
iTRA PI 421 · running 9% above career level — PB pace
Course profile 43 km · +2,778 m
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 52686769
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 52686769
Aid station schedule
START · 0.0 km ✓
out05:30:00
HQ · 10.0 km · Current PI 421 ✓
52nd overall · 45th male
Section time 2h01m03s · 12:06 /km
Section 10.0 km · +1116 / −123 m
expected at07:45 cut-off at09:00
in07:31:03out07:42:53
14 min FASTER than expected
Dwell 12 minutes.
Section PI 525 — way above career, blow-up risk
A1 · 20.3 km · Current PI 494 ✓
68th overall · 53rd male (▼ down 16)
Section time 1h52m53s · 10:58 /km
Section 10.3 km · +323 / −1312 m
expected at09:15 cut-off at12:00
in09:35:46out09:42:16
19 min SLOWER than expected
Dwell 6 minutes.
Section PI 418 — at career level
HQ (2nd visit) · 31.2 km · Current PI 419 ✓
67th overall · 49th male (▲ up 1)
Section time 2h31m41s · 13:55 /km
Section 10.9 km · +1193 / −203 m
expected at12:20 cut-off at16:05
in12:13:57out12:29:11
6 min FASTER than expected
Dwell 15 minutes.
Section PI 453 — at career level
FINISH · 42.9 km · Current PI 443 ✓
69th overall · 50th male (▼ down 2)
Section time 1h46m09s · 9:04 /km
Section 11.7 km · +147 / −1139 m
expected at14:45 cut-off at18:30
in14:15:20
30 min FASTER than expected
Section PI 440 — at career level
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run