Status
Finished
Total time 7h37m35s
Finished at Sat 08 Aug 13:07:35
Effort today
Current Performance Index: 509
iTRA PI 420 · running 21% above career level — PB pace
Course profile 43 km · +2,778 m
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 42334436
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 42334436
Aid station schedule
START · 0.0 km ✓
out05:30:00
HQ · 10.0 km · Current PI 420 ✓
42nd overall · 38th male
Section time 1h57m24s · 11:44 /km
Section 10.0 km · +1116 / −123 m
expected at07:46 cut-off at09:00
in07:27:24out07:32:13
18 min FASTER than expected
Dwell 5 minutes.
Section PI 541 — way above career, blow-up risk
A1 · 20.3 km · Current PI 505 ✓
33rd overall · 29th male (▲ up 9)
Section time 1h30m57s · 8:50 /km
Section 10.3 km · +323 / −1312 m
expected at09:02 cut-off at12:00
in09:03:10out09:07:35
0 min SLOWER than expected
Dwell 4 minutes.
Section PI 519 — going harder than career
HQ (2nd visit) · 31.2 km · Current PI 489 ✓
44th overall · 33rd male (▼ down 11)
Section time 2h25m06s · 13:19 /km
Section 10.9 km · +1193 / −203 m
expected at11:28 cut-off at16:05
in11:32:41out11:36:42
4 min SLOWER than expected
Dwell 4 minutes.
Section PI 473 — going harder than career
FINISH · 42.9 km · Current PI 457 ✓
36th overall · 28th male (▲ up 8)
Section time 1h30m53s · 7:46 /km
Section 11.7 km · +147 / −1139 m
expected at13:41 cut-off at18:30
in13:07:35
34 min FASTER than expected
Section PI 514 — going harder than career
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run