Status
Finished
Total time 8h51m16s
Finished at Sat 08 Aug 14:21:16
Effort today
Current Performance Index: 450
iTRA PI 393 · running 14% above career level — PB pace
Course profile 43 km · +2,778 m
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 65837473
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 65837473
Aid station schedule
START · 0.0 km ✓
out05:30:00
HQ · 10.0 km · Current PI 393 ✓
65th overall · 52nd male
Section time 2h07m10s · 12:43 /km
Section 10.0 km · +1116 / −123 m
expected at07:55 cut-off at09:00
in07:37:10out07:43:15
18 min FASTER than expected
Dwell 6 minutes.
Section PI 500 — way above career, blow-up risk
A1 · 20.3 km · Current PI 468 ✓
83rd overall · 63rd male (▼ down 18)
Section time 2h04m53s · 12:07 /km
Section 10.3 km · +323 / −1312 m
expected at09:20 cut-off at12:00
in09:48:08out09:55:43
27 min SLOWER than expected
Dwell 8 minutes.
Section PI 378 — at career level
HQ (2nd visit) · 31.2 km · Current PI 382 ✓
74th overall · 54th male (▲ up 9)
Section time 2h25m30s · 13:21 /km
Section 10.9 km · +1193 / −203 m
expected at12:46 cut-off at16:05
in12:21:13out12:36:16
25 min FASTER than expected
Dwell 15 minutes.
Section PI 472 — going harder than career
FINISH · 42.9 km · Current PI 448 ✓
73rd overall · 53rd male (▲ up 1)
Section time 1h45m00s · 8:58 /km
Section 11.7 km · +147 / −1139 m
expected at14:57 cut-off at18:30
in14:21:16
35 min FASTER than expected
Section PI 445 — going harder than career
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run