Status
Finished
Total time 8h14m25s
Finished at Sat 08 Aug 13:44:25
Effort today
Current Performance Index: 484
iTRA PI 387 · running 25% above career level — PB pace
Course profile 43 km · +2,778 m
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 61586156
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 61586156
Aid station schedule
START · 0.0 km ✓
out05:30:00
HQ · 10.0 km · Current PI 387 ✓
61st overall · 50th male
Section time 2h06m29s · 12:39 /km
Section 10.0 km · +1116 / −123 m
expected at07:57 cut-off at09:00
in07:36:29out07:43:57
21 min FASTER than expected
Dwell 7 minutes.
Section PI 502 — way above career, blow-up risk
A1 · 20.3 km · Current PI 468 ✓
58th overall · 46th male (▲ up 3)
Section time 1h41m33s · 9:52 /km
Section 10.3 km · +323 / −1312 m
expected at09:21 cut-off at12:00
in09:25:30out09:36:16
4 min SLOWER than expected
Dwell 11 minutes.
Section PI 465 — going harder than career
HQ (2nd visit) · 31.2 km · Current PI 441 ✓
61st overall · 46th male (▼ down 3)
Section time 2h21m01s · 12:56 /km
Section 10.9 km · +1193 / −203 m
expected at12:10 cut-off at16:05
in11:57:17out12:06:12
13 min FASTER than expected
Dwell 9 minutes.
Section PI 487 — way above career, blow-up risk
FINISH · 42.9 km · Current PI 457 ✓
56th overall · 42nd male (▲ up 5)
Section time 1h38m13s · 8:24 /km
Section 11.7 km · +147 / −1139 m
expected at14:16 cut-off at18:30
in13:44:25
32 min FASTER than expected
Section PI 476 — going harder than career
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run