Status
Finished
Total time 12h06m01s
Finished at Sat 08 Aug 17:36:01
Effort today
Current Performance Index: 334
iTRA PI 356 · running 6% below career level — fading
Course profile 43 km · +2,778 m
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 195193211246
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 195193211246
Aid station schedule
START · 0.0 km ✓
out05:30:00
HQ · 10.0 km · Current PI 356 ✓
195th overall · 136th male
Section time 2h41m31s · 16:09 /km
Section 10.0 km · +1116 / −123 m
expected at08:10 cut-off at09:00
in08:11:31out08:22:54
0 min SLOWER than expected
Dwell 11 minutes.
Section PI 393 — at career level
A1 · 20.3 km · Current PI 382 ✓
193rd overall · 136th male (▲ up 2)
Section time 2h20m26s · 13:38 /km
Section 10.3 km · +323 / −1312 m
expected at10:26 cut-off at12:00
in10:43:20out10:54:55
16 min SLOWER than expected
Dwell 12 minutes.
Section PI 336 — at career level
HQ (2nd visit) · 31.2 km · Current PI 342 ✓
211th overall · 140th male (▼ down 18)
Section time 3h22m04s · 18:32 /km
Section 10.9 km · +1193 / −203 m
expected at14:19 cut-off at16:05
in14:16:59out14:43:08
2 min FASTER than expected
Dwell 26 minutes.
Section PI 340 — at career level
FINISH · 42.9 km · Current PI 345 ✓
246th overall · 161st male (▼ down 35)
Section time 2h52m53s · 14:47 /km
Section 11.7 km · +147 / −1139 m
expected at17:41 cut-off at18:30
in17:36:01
5 min FASTER than expected
Section PI 270 — easing off / mild fade
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run