Status
Finished
Total time 11h11m12s
Finished at Sat 08 Aug 16:56:12
Effort today
Current Performance Index: 368
iTRA PI 322 · running 14% above career level — PB pace
Course profile 43 km · +2,778 m
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 163152159169
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 163152159169
Aid station schedule
START · 0.0 km ✓
out05:45:00
HQ · 10.0 km · Current PI 322 ✓
163rd overall · 115th male
Section time 2h36m42s · 15:40 /km
Section 10.0 km · +1116 / −123 m
expected at08:42 cut-off at09:00
in08:21:42out08:33:18
20 min FASTER than expected
Dwell 12 minutes.
Section PI 405 — going harder than career
A1 · 20.3 km · Current PI 380 ✓
152nd overall · 106th male (▲ up 11)
Section time 2h13m20s · 12:57 /km
Section 10.3 km · +323 / −1312 m
expected at10:33 cut-off at12:00
in10:46:38out11:04:02
13 min SLOWER than expected
Dwell 17 minutes.
Section PI 354 — at career level
HQ (2nd visit) · 31.2 km · Current PI 344 ✓
159th overall · 109th male (▼ down 7)
Section time 3h04m16s · 16:54 /km
Section 10.9 km · +1193 / −203 m
expected at14:20 cut-off at16:05
in14:08:18out14:35:45
12 min FASTER than expected
Dwell 27 minutes.
Section PI 373 — going harder than career
FINISH · 42.9 km · Current PI 358 ✓
169th overall · 112th male (▼ down 10)
Section time 2h20m27s · 12:00 /km
Section 11.7 km · +147 / −1139 m
expected at17:23 cut-off at18:30
in16:56:12
27 min FASTER than expected
Section PI 333 — at career level
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run