Status
Finished
Total time 11h08m16s
Finished at Sat 08 Aug 16:53:16
Effort today
Current Performance Index: 386
iTRA PI 303 · running 27% above career level — PB pace
Course profile 43 km · +2,778 m
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 100168184164
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 100168184164
Aid station schedule
START · 0.0 km ✓
out05:45:00
HQ · 10.0 km · Current PI 303 ✓
100th overall · 76th male
Section time 2h21m18s · 14:08 /km
Section 10.0 km · +1116 / −123 m
expected at08:53 cut-off at09:00
in08:06:18out08:41:21
47 min FASTER than expected
Dwell 35 minutes.
Section PI 450 — way above career, blow-up risk
A1 · 20.3 km · Current PI 406 ✓
168th overall · 118th male (▼ down 68)
Section time 2h08m47s · 12:30 /km
Section 10.3 km · +323 / −1312 m
expected at10:29 cut-off at12:00
in10:50:08out11:10:21
20 min SLOWER than expected
Dwell 20 minutes.
Section PI 366 — going harder than career
HQ (2nd visit) · 31.2 km · Current PI 347 ✓
184th overall · 124th male (▼ down 16)
Section time 3h07m24s · 17:12 /km
Section 10.9 km · +1193 / −203 m
expected at14:13 cut-off at16:05
in14:17:45out14:45:14
4 min SLOWER than expected
Dwell 27 minutes.
Section PI 366 — going harder than career
FINISH · 42.9 km · Current PI 347 ✓
164th overall · 107th male (▲ up 20)
Section time 2h08m02s · 10:57 /km
Section 11.7 km · +147 / −1139 m
expected at17:27 cut-off at18:30
in16:53:16
33 min FASTER than expected
Section PI 365 — going harder than career
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run