Status
Finished
Total time 11h28m25s
Finished at Sat 08 Aug 17:13:25
Effort today
Current Performance Index: 353
iTRA PI 298 · running 18% above career level — PB pace
Course profile 43 km · +2,778 m
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 131156169194
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 131156169194
Aid station schedule
START · 0.0 km ✓
out05:45:00
HQ · 10.0 km · Current PI 298 ✓
131st overall · 95th male
Section time 2h30m49s · 15:05 /km
Section 10.0 km · +1116 / −123 m
expected at08:56 cut-off at09:00
in08:15:49out08:28:02
41 min FASTER than expected
Dwell 12 minutes.
Section PI 421 — way above career, blow-up risk
A1 · 20.3 km · Current PI 384 ✓
156th overall · 109th male (▼ down 25)
Section time 2h19m23s · 13:32 /km
Section 10.3 km · +323 / −1312 m
expected at10:23 cut-off at12:00
in10:47:25out11:00:01
23 min SLOWER than expected
Dwell 13 minutes.
Section PI 339 — at career level
HQ (2nd visit) · 31.2 km · Current PI 326 ✓
169th overall · 113th male (▼ down 13)
Section time 3h14m05s · 17:48 /km
Section 10.9 km · +1193 / −203 m
expected at14:16 cut-off at16:05
in14:14:06out14:37:08
2 min FASTER than expected
Dwell 23 minutes.
Section PI 354 — going harder than career
FINISH · 42.9 km · Current PI 337 ✓
194th overall · 129th male (▼ down 25)
Section time 2h36m17s · 13:21 /km
Section 11.7 km · +147 / −1139 m
expected at17:28 cut-off at18:30
in17:13:25
15 min FASTER than expected
Section PI 299 — at career level
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run