Status
Finished
Total time 12h40m13s
Finished at Sat 08 Aug 18:25:13
Effort today
Current Performance Index: 320
iTRA PI 283 · running 13% above career level — PB pace
Course profile 43 km · +2,778 m
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 281285305295
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 281285305295
Aid station schedule
START · 0.0 km ✓
out05:45:00
HQ · 10.0 km · Current PI 283 ✓
281st overall · 189th male
Section time 3h01m44s · 18:10 /km
Section 10.0 km · +1116 / −123 m
expected at09:07 cut-off at09:00
in08:46:44out09:04:42
20 min FASTER than expected
Dwell 18 minutes.
Section PI 350 — going harder than career
A1 · 20.3 km · Current PI 330 ✓
285th overall · 191st male (▼ down 4)
Section time 2h34m28s · 15:00 /km
Section 10.3 km · +323 / −1312 m
expected at11:24 cut-off at12:00
in11:39:10out11:57:29
14 min SLOWER than expected
Dwell 18 minutes.
Section PI 306 — at career level
HQ (2nd visit) · 31.2 km · Current PI 299 ✓
305th overall · 195th male (▼ down 20)
Section time 3h35m44s · 19:48 /km
Section 10.9 km · +1193 / −203 m
expected at15:45 cut-off at16:05
in15:33:13out15:50:08
11 min FASTER than expected
Dwell 17 minutes.
Section PI 318 — at career level
FINISH · 42.9 km · Current PI 308 ✓
295th overall · 189th male (▲ up 10)
Section time 2h35m05s · 13:15 /km
Section 11.7 km · +147 / −1139 m
expected at19:05 cut-off at18:30
in18:25:13
40 min FASTER than expected
Section PI 301 — at career level
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run