Status
Finished
Total time 12h32m32s
Finished at Sat 08 Aug 18:17:32
Effort today
Current Performance Index: 321
iTRA PI 278 · running 15% above career level — PB pace
Course profile 43 km · +2,778 m
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 342302300275
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 342302300275
Aid station schedule
START · 0.0 km ✓
out05:45:00
HQ · 10.0 km · Current PI 278 ✓
342nd overall · 223rd male
Section time 3h17m40s · 19:46 /km
Section 10.0 km · +1116 / −123 m
expected at09:10 cut-off at09:00
in09:02:40out09:18:47
8 min FASTER than expected
Dwell 16 minutes.
Section PI 321 — at career level
A1 · 20.3 km · Current PI 308 ✓
302nd overall · 199th male (▲ up 40)
Section time 2h30m18s · 14:36 /km
Section 10.3 km · +323 / −1312 m
expected at11:50 cut-off at12:00
in11:49:05out12:03:36
1 min FASTER than expected
Dwell 15 minutes.
Section PI 314 — at career level
HQ (2nd visit) · 31.2 km · Current PI 303 ✓
300th overall · 192nd male (▲ up 2)
Section time 3h27m50s · 19:04 /km
Section 10.9 km · +1193 / −203 m
expected at15:59 cut-off at16:05
in15:31:26out15:48:05
27 min FASTER than expected
Dwell 17 minutes.
Section PI 330 — going harder than career
FINISH · 42.9 km · Current PI 315 ✓
275th overall · 177th male (▲ up 25)
Section time 2h29m27s · 12:46 /km
Section 11.7 km · +147 / −1139 m
expected at19:04 cut-off at18:30
in18:17:32
47 min FASTER than expected
Section PI 312 — at career level
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run