Status
Finished
Total time 12h05m03s
Finished at Sat 08 Aug 17:50:03
Effort today
Current Performance Index: 340
iTRA PI 272 · running 25% above career level — PB pace
Course profile 43 km · +2,778 m
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 172161199245
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 172161199245
Aid station schedule
START · 0.0 km ✓
out05:45:00
HQ · 10.0 km · Current PI 272 ✓
172nd overall · 122nd male
Section time 2h37m54s · 15:47 /km
Section 10.0 km · +1116 / −123 m
expected at09:15 cut-off at09:00
in08:22:54out08:39:18
52 min FASTER than expected
Dwell 16 minutes.
Section PI 402 — way above career, blow-up risk
A1 · 20.3 km · Current PI 363 ✓
161st overall · 112th male (▲ up 11)
Section time 2h08m44s · 12:30 /km
Section 10.3 km · +323 / −1312 m
expected at10:40 cut-off at12:00
in10:48:02out11:13:25
7 min SLOWER than expected
Dwell 25 minutes.
Section PI 367 — going harder than career
HQ (2nd visit) · 31.2 km · Current PI 338 ✓
199th overall · 132nd male (▼ down 38)
Section time 3h12m58s · 17:42 /km
Section 10.9 km · +1193 / −203 m
expected at14:27 cut-off at16:05
in14:26:23out14:45:33
1 min FASTER than expected
Dwell 19 minutes.
Section PI 356 — going harder than career
FINISH · 42.9 km · Current PI 331 ✓
245th overall · 160th male (▼ down 46)
Section time 3h04m30s · 15:46 /km
Section 11.7 km · +147 / −1139 m
expected at17:35 cut-off at18:30
in17:50:03
14 min SLOWER than expected
Section PI 253 — at career level
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run