Status
Finished
Total time 12h57m54s
Finished at Sat 08 Aug 18:42:54
Effort today
Current Performance Index: 305
iTRA PI 243 · running 26% above career level — PB pace
Course profile 43 km · +2,778 m
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 335307319312
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 335307319312
Aid station schedule
START · 0.0 km ✓
out05:45:00
HQ · 10.0 km · Current PI 243 ✓
335th overall · 220th male
Section time 3h13m20s · 19:20 /km
Section 10.0 km · +1116 / −123 m
expected at09:40 cut-off at09:00
in08:58:20out09:10:44
42 min FASTER than expected
Dwell 12 minutes.
Section PI 329 — going harder than career
A1 · 20.3 km · Current PI 303 ✓
307th overall · 203rd male (▲ up 28)
Section time 2h40m15s · 15:33 /km
Section 10.3 km · +323 / −1312 m
expected at11:39 cut-off at12:00
in11:50:59out12:00:27
11 min SLOWER than expected
Dwell 9 minutes.
Section PI 295 — going harder than career
HQ (2nd visit) · 31.2 km · Current PI 279 ✓
319th overall · 202nd male (▼ down 12)
Section time 3h59m50s · 22:00 /km
Section 10.9 km · +1193 / −203 m
expected at15:59 cut-off at16:05
in16:00:17out16:15:45
0 min SLOWER than expected
Dwell 15 minutes.
Section PI 286 — at career level
FINISH · 42.9 km · Current PI 273 ✓
312th overall · 199th male (▲ up 7)
Section time 2h27m09s · 12:35 /km
Section 11.7 km · +147 / −1139 m
expected at19:45 cut-off at18:30
in18:42:54
62 min FASTER than expected
Section PI 317 — going harder than career
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run