← i2 leaderboard

YANGYUENKUL, AUTEN

Race i2 · Bib 2253 · Male · iTRA PI 233
Status
Finished
Total time 11h46m10s
Finished at Sat 08 Aug 17:31:10
Effort today
Current Performance Index: 348
iTRA PI 233 · running 49% above career level — PB pace
Aid station schedule
START · 0.0 km ✓
out05:45:00
HQ_IN_1 · 10.0 km · Current PI 233 ✓
Section time 2h34m29s
Section 10.0 km · +1116 / −123 m
expected at09:50 cut-off at09:00
in08:19:29out08:31:02
90 min FASTER than expected
Dwell 12 minutes.
Section PI 411 — way above career, blow-up risk
A1_IN · 20.3 km · Current PI 358 ✓
Section time 2h18m58s
Section 10.3 km · +323 / −1312 m
expected at10:29 cut-off at12:00
in10:50:00out11:08:19
20 min SLOWER than expected
Dwell 18 minutes.
Section PI 340 — way above career, blow-up risk
HQ_IN_2 · 31.2 km · Current PI 308 ✓
Section time 3h06m54s
Section 10.9 km · +1193 / −203 m
expected at14:26 cut-off at16:05
in14:15:13out14:41:50
11 min FASTER than expected
Dwell 27 minutes.
Section PI 367 — way above career, blow-up risk
FINISH · 42.9 km · Current PI 327 ✓
Section time 2h49m20s
Section 11.7 km · +147 / −1139 m
expected at17:31 cut-off at18:30
in17:31:10
0 min FASTER than expected
Section PI 276 — at career level
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.