Status
Finished
Total time 11h45m42s
Finished at Sat 08 Aug 17:30:42
Effort today
Current Performance Index: 347
iTRA PI 229 · running 51% above career level — PB pace
Course profile 43 km · +2,778 m
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 233232241219
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 233232241219
Aid station schedule
START · 0.0 km ✓
out05:45:00
HQ · 10.0 km · Current PI 229 ✓
233rd overall · 157th male
Section time 2h46m56s · 16:42 /km
Section 10.0 km · +1116 / −123 m
expected at09:54 cut-off at09:00
in08:31:56out08:48:28
82 min FASTER than expected
Dwell 17 minutes.
Section PI 381 — way above career, blow-up risk
A1 · 20.3 km · Current PI 335 ✓
232nd overall · 159th male (▲ up 1)
Section time 2h26m27s · 14:13 /km
Section 10.3 km · +323 / −1312 m
expected at10:56 cut-off at12:00
in11:14:55out11:23:38
18 min SLOWER than expected
Dwell 9 minutes.
Section PI 322 — going harder than career
HQ (2nd visit) · 31.2 km · Current PI 294 ✓
241st overall · 158th male (▼ down 9)
Section time 3h22m27s · 18:34 /km
Section 10.9 km · +1193 / −203 m
expected at14:55 cut-off at16:05
in14:46:05out15:14:08
9 min FASTER than expected
Dwell 28 minutes.
Section PI 339 — way above career, blow-up risk
FINISH · 42.9 km · Current PI 306 ✓
219th overall · 145th male (▲ up 22)
Section time 2h16m34s · 11:40 /km
Section 11.7 km · +147 / −1139 m
expected at18:16 cut-off at18:30
in17:30:42
46 min FASTER than expected
Section PI 342 — way above career, blow-up risk
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run