Status
Finished
Total time 11h11m06s
Finished at Sat 08 Aug 16:56:06
Effort today
Current Performance Index: 355
(no iTRA PI) · Current PI: 355
Course profile 43 km · +2,778 m
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 135145171168
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 135145171168
Aid station schedule
START · 0.0 km ✓
out05:45:00
HQ · 10.0 km ✓
135th overall · 98th male
Section time 2h31m37s · 15:10 /km
Section 10.0 km · +1116 / −123 m
cut-off at09:00
in08:16:37out08:19:43
Dwell 3 minutes.
Section PI 419
A1 · 20.3 km · Current PI 419 ✓
145th overall · 101st male (▼ down 10)
Section time 2h23m54s · 13:58 /km
Section 10.3 km · +323 / −1312 m
expected at10:16 cut-off at12:00
in10:43:37out10:54:06
27 min SLOWER than expected
Dwell 10 minutes.
Section PI 328
HQ (2nd visit) · 31.2 km · Current PI 328 ✓
171st overall · 114th male (▼ down 26)
Section time 3h20m20s · 18:23 /km
Section 10.9 km · +1193 / −203 m
expected at14:14 cut-off at16:05
in14:14:26out14:35:39
0 min SLOWER than expected
Dwell 21 minutes.
Section PI 343
FINISH · 42.9 km · Current PI 343 ✓
168th overall · 111th male (▲ up 3)
Section time 2h20m27s · 12:00 /km
Section 11.7 km · +147 / −1139 m
expected at17:31 cut-off at18:30
in16:56:06
35 min FASTER than expected
Section PI 333
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run