Status
Finished
Total time 12h28m48s
Finished at Sat 08 Aug 18:13:48
Effort today
Current Performance Index: 336
(no iTRA PI) · Current PI: 336
Course profile 43 km · +2,778 m
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 189275270269
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 189275270269
Aid station schedule
START · 0.0 km ✓
out05:45:00
HQ · 10.0 km ✓
189th overall · 133rd male
Section time 2h41m03s · 16:06 /km
Section 10.0 km · +1116 / −123 m
cut-off at09:00
in08:26:03out08:43:51
Dwell 18 minutes.
Section PI 394
A1 · 20.3 km · Current PI 394 ✓
275th overall · 185th male (▼ down 86)
Section time 2h49m16s · 16:26 /km
Section 10.3 km · +323 / −1312 m
expected at10:47 cut-off at12:00
in11:33:07out11:50:45
45 min SLOWER than expected
Dwell 18 minutes.
Section PI 279
HQ (2nd visit) · 31.2 km · Current PI 279 ✓
270th overall · 178th male (▲ up 5)
Section time 3h18m29s · 18:13 /km
Section 10.9 km · +1193 / −203 m
expected at15:34 cut-off at16:05
in15:09:14out15:49:12
25 min FASTER than expected
Dwell 40 minutes.
Section PI 346
FINISH · 42.9 km · Current PI 346 ✓
269th overall · 175th male (▲ up 1)
Section time 2h24m36s · 12:22 /km
Section 11.7 km · +147 / −1139 m
expected at18:56 cut-off at18:30
in18:13:48
42 min FASTER than expected
Section PI 323
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run