Status
Finished
Total time 11h33m19s
Finished at Sat 08 Aug 17:18:19
Effort today
Current Performance Index: 341
(no iTRA PI) · Current PI: 341
Course profile 43 km · +2,778 m
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 211179177199
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 211179177199
Aid station schedule
START · 0.0 km ✓
out05:45:00
HQ · 10.0 km ✓
211th overall · 148th male
Section time 2h43m44s · 16:22 /km
Section 10.0 km · +1116 / −123 m
cut-off at09:00
in08:28:44out08:34:40
Dwell 6 minutes.
Section PI 388
A1 · 20.3 km · Current PI 388 ✓
179th overall · 127th male (▲ up 32)
Section time 2h21m03s · 13:42 /km
Section 10.3 km · +323 / −1312 m
expected at10:40 cut-off at12:00
in10:55:43out11:04:09
15 min SLOWER than expected
Dwell 8 minutes.
Section PI 335
HQ (2nd visit) · 31.2 km · Current PI 335 ✓
177th overall · 119th male (▲ up 2)
Section time 3h12m29s · 17:40 /km
Section 10.9 km · +1193 / −203 m
expected at14:30 cut-off at16:05
in14:16:38out14:32:50
13 min FASTER than expected
Dwell 16 minutes.
Section PI 357
FINISH · 42.9 km · Current PI 357 ✓
199th overall · 130th male (▼ down 22)
Section time 2h45m29s · 14:09 /km
Section 11.7 km · +147 / −1139 m
expected at17:28 cut-off at18:30
in17:18:19
10 min FASTER than expected
Section PI 282
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run