Status
Finished
Total time 7h14m27s
Finished at Sat 08 Aug 12:44:27
Effort today
Current Performance Index: 530
iTRA PI 436 · running 22% above career level — PB pace
Course profile 43 km · +2,778 m
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 31272726
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 31272726
Aid station schedule
START · 0.0 km ✓
out05:30:00
HQ · 10.0 km · Current PI 436 ✓
31st overall · 4th female
Section time 1h52m56s · 11:18 /km
Section 10.0 km · +1116 / −123 m
expected at07:41 cut-off at09:00
in07:22:56out07:25:41
18 min FASTER than expected
Dwell 3 minutes.
Section PI 562 — way above career, blow-up risk
A1 · 20.3 km · Current PI 525 ✓
27th overall · 3rd female (▲ up 4)
Section time 1h23m57s · 8:09 /km
Section 10.3 km · +323 / −1312 m
expected at08:52 cut-off at12:00
in08:49:38out08:52:28
2 min FASTER than expected
Dwell 3 minutes.
Section PI 562 — way above career, blow-up risk
HQ (2nd visit) · 31.2 km · Current PI 524 ✓
27th overall · 5th female
Section time 2h13m21s · 12:14 /km
Section 10.9 km · +1193 / −203 m
expected at11:05 cut-off at16:05
in11:05:49out11:08:27
0 min SLOWER than expected
Dwell 3 minutes.
Section PI 515 — going harder than career
FINISH · 42.9 km · Current PI 491 ✓
26th overall · 4th female (▲ up 1)
Section time 1h36m00s · 8:12 /km
Section 11.7 km · +147 / −1139 m
expected at13:05 cut-off at18:30
in12:44:27
20 min FASTER than expected
Section PI 486 — going harder than career
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run