Status
Finished
Total time 8h53m22s
Finished at Sat 08 Aug 14:23:22
Effort today
Current Performance Index: 435
iTRA PI 392 · running 11% above career level — PB pace
Course profile 43 km · +2,778 m
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 103898375
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 103898375
Aid station schedule
START · 0.0 km ✓
out05:30:00
HQ · 10.0 km · Current PI 392 ✓
103rd overall · 25th female
Section time 2h22m02s · 14:12 /km
Section 10.0 km · +1116 / −123 m
expected at07:55 cut-off at09:00
in07:52:02out07:59:53
3 min FASTER than expected
Dwell 8 minutes.
Section PI 447 — going harder than career
A1 · 20.3 km · Current PI 431 ✓
89th overall · 23rd female (▲ up 14)
Section time 1h52m33s · 10:56 /km
Section 10.3 km · +323 / −1312 m
expected at09:48 cut-off at12:00
in09:52:26out09:55:26
3 min SLOWER than expected
Dwell 3 minutes.
Section PI 419 — at career level
HQ (2nd visit) · 31.2 km · Current PI 411 ✓
83rd overall · 25th female (▲ up 6)
Section time 2h37m22s · 14:26 /km
Section 10.9 km · +1193 / −203 m
expected at12:47 cut-off at16:05
in12:32:48out12:36:02
14 min FASTER than expected
Dwell 3 minutes.
Section PI 436 — at career level
FINISH · 42.9 km · Current PI 423 ✓
75th overall · 22nd female (▲ up 8)
Section time 1h47m20s · 9:10 /km
Section 11.7 km · +147 / −1139 m
expected at15:01 cut-off at18:30
in14:23:22
38 min FASTER than expected
Section PI 435 — at career level
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run