Status
Finished
Total time 8h39m24s
Finished at Sat 08 Aug 14:09:24
Effort today
Current Performance Index: 464
iTRA PI 372 · running 25% above career level — PB pace
Course profile 43 km · +2,778 m
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 63596565
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 63596565
Aid station schedule
START · 0.0 km ✓
out05:30:00
HQ · 10.0 km · Current PI 372 ✓
63rd overall · 12th female
Section time 2h07m06s · 12:43 /km
Section 10.0 km · +1116 / −123 m
expected at08:03 cut-off at09:00
in07:37:06out07:44:54
26 min FASTER than expected
Dwell 8 minutes.
Section PI 500 — way above career, blow-up risk
A1 · 20.3 km · Current PI 461 ✓
59th overall · 13th female (▲ up 4)
Section time 1h42m28s · 9:57 /km
Section 10.3 km · +323 / −1312 m
expected at09:22 cut-off at12:00
in09:27:22out09:34:11
4 min SLOWER than expected
Dwell 7 minutes.
Section PI 461 — going harder than career
HQ (2nd visit) · 31.2 km · Current PI 434 ✓
65th overall · 18th female (▼ down 6)
Section time 2h27m25s · 13:31 /km
Section 10.9 km · +1193 / −203 m
expected at12:09 cut-off at16:05
in12:01:36out12:19:25
7 min FASTER than expected
Dwell 18 minutes.
Section PI 466 — going harder than career
FINISH · 42.9 km · Current PI 438 ✓
65th overall · 18th female
Section time 1h49m59s · 9:24 /km
Section 11.7 km · +147 / −1139 m
expected at14:32 cut-off at18:30
in14:09:24
23 min FASTER than expected
Section PI 425 — going harder than career
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run