Status
Finished
Total time 12h44m31s
Finished at Sat 08 Aug 18:14:31
Effort today
Current Performance Index: 312
iTRA PI 335 · running 7% below career level — fading
Course profile 43 km · +2,778 m
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 337317289300
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 337317289300
Aid station schedule
START · 0.0 km ✓
out05:30:00
HQ · 10.0 km · Current PI 335 ✓
337th overall · 117th female
Section time 3h13m36s · 19:22 /km
Section 10.0 km · +1116 / −123 m
expected at08:20 cut-off at09:00
in08:43:36out09:00:43
22 min SLOWER than expected
Dwell 17 minutes.
Section PI 328 — at career level
A1 · 20.3 km · Current PI 330 ✓
317th overall · 110th female (▲ up 20)
Section time 2h39m02s · 15:26 /km
Section 10.3 km · +323 / −1312 m
expected at11:29 cut-off at12:00
in11:39:45out11:46:31
10 min SLOWER than expected
Dwell 7 minutes.
Section PI 297 — at career level
HQ (2nd visit) · 31.2 km · Current PI 308 ✓
289th overall · 101st female (▲ up 28)
Section time 3h26m27s · 18:56 /km
Section 10.9 km · +1193 / −203 m
expected at15:45 cut-off at16:05
in15:12:58out15:30:01
32 min FASTER than expected
Dwell 17 minutes.
Section PI 333 — at career level
FINISH · 42.9 km · Current PI 333 ✓
300th overall · 108th female (▼ down 11)
Section time 2h44m30s · 14:04 /km
Section 11.7 km · +147 / −1139 m
expected at18:47 cut-off at18:30
in18:14:31
33 min FASTER than expected
Section PI 284 — easing off / mild fade
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run