Status
Finished
Total time 11h43m12s
Finished at Sat 08 Aug 17:13:12
Effort today
Current Performance Index: 337
iTRA PI 319 · running 6% above career level — PB pace
Course profile 43 km · +2,778 m
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 157147182212
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 157147182212
Aid station schedule
START · 0.0 km ✓
out05:30:00
HQ · 10.0 km · Current PI 319 ✓
157th overall · 44th female
Section time 2h36m14s · 15:37 /km
Section 10.0 km · +1116 / −123 m
expected at08:29 cut-off at09:00
in08:06:14out08:13:31
23 min FASTER than expected
Dwell 7 minutes.
Section PI 407 — going harder than career
A1 · 20.3 km · Current PI 380 ✓
147th overall · 45th female (▲ up 10)
Section time 2h16m03s · 13:13 /km
Section 10.3 km · +323 / −1312 m
expected at10:13 cut-off at12:00
in10:29:34out10:42:07
16 min SLOWER than expected
Dwell 13 minutes.
Section PI 347 — at career level
HQ (2nd visit) · 31.2 km · Current PI 339 ✓
182nd overall · 60th female (▼ down 35)
Section time 3h20m29s · 18:24 /km
Section 10.9 km · +1193 / −203 m
expected at13:59 cut-off at16:05
in14:02:36out14:16:00
2 min SLOWER than expected
Dwell 13 minutes.
Section PI 343 — at career level
FINISH · 42.9 km · Current PI 335 ✓
212th overall · 74th female (▼ down 30)
Section time 2h57m12s · 15:09 /km
Section 11.7 km · +147 / −1139 m
expected at17:10 cut-off at18:30
in17:13:12
2 min SLOWER than expected
Section PI 264 — easing off / mild fade
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run