Status
Finished
Total time 10h44m20s
Finished at Sat 08 Aug 16:14:20
Effort today
Current Performance Index: 386
iTRA PI 318 · running 21% above career level — PB pace
Course profile 43 km · +2,778 m
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 212176160139
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 212176160139
Aid station schedule
START · 0.0 km ✓
out05:30:00
HQ · 10.0 km · Current PI 318 ✓
212th overall · 64th female
Section time 2h43m48s · 16:23 /km
Section 10.0 km · +1116 / −123 m
expected at08:29 cut-off at09:00
in08:13:48out08:27:07
16 min FASTER than expected
Dwell 13 minutes.
Section PI 388 — going harder than career
A1 · 20.3 km · Current PI 367 ✓
176th overall · 51st female (▲ up 36)
Section time 2h12m12s · 12:50 /km
Section 10.3 km · +323 / −1312 m
expected at10:32 cut-off at12:00
in10:39:19out11:05:53
6 min SLOWER than expected
Dwell 27 minutes.
Section PI 357 — at career level
HQ (2nd visit) · 31.2 km · Current PI 345 ✓
160th overall · 51st female (▲ up 16)
Section time 2h47m43s · 15:23 /km
Section 10.9 km · +1193 / −203 m
expected at14:26 cut-off at16:05
in13:53:36out14:12:43
32 min FASTER than expected
Dwell 19 minutes.
Section PI 409 — going harder than career
FINISH · 42.9 km · Current PI 382 ✓
139th overall · 44th female (▲ up 21)
Section time 2h01m37s · 10:24 /km
Section 11.7 km · +147 / −1139 m
expected at16:56 cut-off at18:30
in16:14:20
42 min FASTER than expected
Section PI 384 — going harder than career
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run