Status
Finished
Total time 10h45m38s
Finished at Sat 08 Aug 16:15:38
Effort today
Current Performance Index: 371
iTRA PI 314 · running 18% above career level — PB pace
Course profile 43 km · +2,778 m
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 216141157141
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 216141157141
Aid station schedule
START · 0.0 km ✓
out05:30:00
HQ · 10.0 km · Current PI 314 ✓
216th overall · 66th female
Section time 2h44m51s · 16:29 /km
Section 10.0 km · +1116 / −123 m
expected at08:32 cut-off at09:00
in08:14:51out08:19:56
17 min FASTER than expected
Dwell 5 minutes.
Section PI 385 — going harder than career
A1 · 20.3 km · Current PI 364 ✓
141st overall · 43rd female (▲ up 75)
Section time 2h07m02s · 12:20 /km
Section 10.3 km · +323 / −1312 m
expected at10:26 cut-off at12:00
in10:26:58out10:42:03
0 min SLOWER than expected
Dwell 15 minutes.
Section PI 372 — going harder than career
HQ (2nd visit) · 31.2 km · Current PI 354 ✓
157th overall · 50th female (▼ down 16)
Section time 3h10m28s · 17:28 /km
Section 10.9 km · +1193 / −203 m
expected at13:59 cut-off at16:05
in13:52:31out14:07:52
7 min FASTER than expected
Dwell 15 minutes.
Section PI 361 — at career level
FINISH · 42.9 km · Current PI 347 ✓
141st overall · 45th female (▲ up 16)
Section time 2h07m46s · 10:55 /km
Section 11.7 km · +147 / −1139 m
expected at16:58 cut-off at18:30
in16:15:38
43 min FASTER than expected
Section PI 366 — going harder than career
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run