Status
Finished
Total time 12h32m44s
Finished at Sat 08 Aug 18:17:44
Effort today
Current Performance Index: 325
iTRA PI 293 · running 11% above career level — PB pace
Course profile 43 km · +2,778 m
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 273293284277
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 273293284277
Aid station schedule
START · 0.0 km ✓
out05:45:00
HQ · 10.0 km · Current PI 293 ✓
273rd overall · 89th female
Section time 2h59m25s · 17:56 /km
Section 10.0 km · +1116 / −123 m
expected at09:00 cut-off at09:00
in08:44:25out08:56:48
15 min FASTER than expected
Dwell 12 minutes.
Section PI 354 — going harder than career
A1 · 20.3 km · Current PI 336 ✓
293rd overall · 98th female (▼ down 20)
Section time 2h46m22s · 16:09 /km
Section 10.3 km · +323 / −1312 m
expected at11:14 cut-off at12:00
in11:43:10out11:59:21
28 min SLOWER than expected
Dwell 16 minutes.
Section PI 284 — at career level
HQ (2nd visit) · 31.2 km · Current PI 286 ✓
284th overall · 98th female (▲ up 9)
Section time 3h24m21s · 18:45 /km
Section 10.9 km · +1193 / −203 m
expected at15:53 cut-off at16:05
in15:23:42out15:52:51
29 min FASTER than expected
Dwell 29 minutes.
Section PI 336 — at career level
FINISH · 42.9 km · Current PI 323 ✓
277th overall · 100th female (▲ up 7)
Section time 2h24m53s · 12:23 /km
Section 11.7 km · +147 / −1139 m
expected at19:07 cut-off at18:30
in18:17:44
49 min FASTER than expected
Section PI 322 — at career level
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run