Status
Finished
Total time 10h41m10s
Finished at Sat 08 Aug 16:26:10
Effort today
Current Performance Index: 389
iTRA PI 282 · running 38% above career level — PB pace
Course profile 43 km · +2,778 m
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 125135119135
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 125135119135
Aid station schedule
START · 0.0 km ✓
out05:45:00
HQ · 10.0 km · Current PI 282 ✓
125th overall · 33rd female
Section time 2h28m22s · 14:50 /km
Section 10.0 km · +1116 / −123 m
expected at09:07 cut-off at09:00
in08:13:22out08:28:38
54 min FASTER than expected
Dwell 15 minutes.
Section PI 428 — way above career, blow-up risk
A1 · 20.3 km · Current PI 384 ✓
135th overall · 41st female (▼ down 10)
Section time 2h12m13s · 12:50 /km
Section 10.3 km · +323 / −1312 m
expected at10:22 cut-off at12:00
in10:40:51out10:59:18
18 min SLOWER than expected
Dwell 18 minutes.
Section PI 357 — going harder than career
HQ (2nd visit) · 31.2 km · Current PI 334 ✓
119th overall · 37th female (▲ up 16)
Section time 2h38m57s · 14:35 /km
Section 10.9 km · +1193 / −203 m
expected at14:09 cut-off at16:05
in13:38:15out14:04:43
30 min FASTER than expected
Dwell 26 minutes.
Section PI 432 — way above career, blow-up risk
FINISH · 42.9 km · Current PI 387 ✓
135th overall · 41st female (▼ down 16)
Section time 2h21m27s · 12:05 /km
Section 11.7 km · +147 / −1139 m
expected at16:40 cut-off at18:30
in16:26:10
14 min FASTER than expected
Section PI 330 — at career level
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run