Status
Finished
Total time 13h08m43s
Finished at Sat 08 Aug 18:53:43
Effort today
Current Performance Index: 306
iTRA PI 268 · running 14% above career level — PB pace
Course profile 43 km · +2,778 m
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 348331311314
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 348331311314
Aid station schedule
START · 0.0 km ✓
out05:45:00
HQ · 10.0 km · Current PI 268 ✓
348th overall · 124th female
Section time 3h19m47s · 19:59 /km
Section 10.0 km · +1116 / −123 m
expected at09:18 cut-off at09:00
in09:04:47out09:20:46
13 min FASTER than expected
Dwell 16 minutes.
Section PI 318 — at career level
A1 · 20.3 km · Current PI 303 ✓
331st overall · 117th female (▲ up 17)
Section time 2h41m44s · 15:42 /km
Section 10.3 km · +323 / −1312 m
expected at11:54 cut-off at12:00
in12:02:30out12:13:23
8 min SLOWER than expected
Dwell 11 minutes.
Section PI 292 — at career level
HQ (2nd visit) · 31.2 km · Current PI 285 ✓
311th overall · 113th female (▲ up 20)
Section time 3h28m26s · 19:07 /km
Section 10.9 km · +1193 / −203 m
expected at16:18 cut-off at16:05
in15:41:49out16:03:54
36 min FASTER than expected
Dwell 22 minutes.
Section PI 329 — going harder than career
FINISH · 42.9 km · Current PI 311 ✓
314th overall · 114th female (▼ down 3)
Section time 2h49m49s · 14:31 /km
Section 11.7 km · +147 / −1139 m
expected at19:25 cut-off at18:30
in18:53:43
31 min FASTER than expected
Section PI 275 — at career level
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run