Status
Finished
Total time 12h39m30s
Finished at Sat 08 Aug 18:24:30
Effort today
Current Performance Index: 312
iTRA PI 263 · running 18% above career level — PB pace
Course profile 43 km · +2,778 m
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 353328299293
START HQ A1 HQ FINISH
Position overall at each station (1st at the top, 431 at the bottom)
1st431st 353328299293
Aid station schedule
START · 0.0 km ✓
out05:45:00
HQ · 10.0 km · Current PI 263 ✓
353rd overall · 128th female
Section time 3h20m34s · 20:03 /km
Section 10.0 km · +1116 / −123 m
expected at09:22 cut-off at09:00
in09:05:34out09:20:53
16 min FASTER than expected
Dwell 15 minutes.
Section PI 317 — going harder than career
A1 · 20.3 km · Current PI 301 ✓
328th overall · 115th female (▲ up 25)
Section time 2h40m18s · 15:34 /km
Section 10.3 km · +323 / −1312 m
expected at11:54 cut-off at12:00
in12:01:11out12:12:27
6 min SLOWER than expected
Dwell 11 minutes.
Section PI 294 — at career level
HQ (2nd visit) · 31.2 km · Current PI 285 ✓
299th overall · 108th female (▲ up 29)
Section time 3h18m45s · 18:14 /km
Section 10.9 km · +1193 / −203 m
expected at16:16 cut-off at16:05
in15:31:12out15:38:37
45 min FASTER than expected
Dwell 7 minutes.
Section PI 346 — going harder than career
FINISH · 42.9 km · Current PI 321 ✓
293rd overall · 106th female (▲ up 6)
Section time 2h45m53s · 14:11 /km
Section 11.7 km · +147 / −1139 m
expected at18:56 cut-off at18:30
in18:24:30
32 min FASTER than expected
Section PI 282 — at career level
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run