← i2 leaderboard

INTHARAT, JURARAT

Race i2 · Bib 2687 · Female · (no iTRA PI)
Status
Finished
Total time 10h18m30s
Finished at Sat 08 Aug 15:48:30
Effort today
Current Performance Index: 376
(no iTRA PI) · Current PI: 376
Aid station schedule
START · 0.0 km ✓
out05:30:00
HQ_IN_1 · 10.0 km ✓
Section time 2h43m06s
Section 10.0 km · +1116 / −123 m
cut-off at09:00
in08:13:06out08:19:11
Dwell 6 minutes.
Section PI 389
A1_IN · 20.3 km · Current PI 389 ✓
Section time 2h10m36s
Section 10.3 km · +323 / −1312 m
expected at10:24 cut-off at12:00
in10:29:47out10:34:18
5 min SLOWER than expected
Dwell 5 minutes.
Section PI 361
HQ_IN_2 · 31.2 km · Current PI 361 ✓
Section time 2h58m12s
Section 10.9 km · +1193 / −203 m
expected at13:53 cut-off at16:05
in13:32:30out13:39:34
20 min FASTER than expected
Dwell 7 minutes.
Section PI 385
FINISH · 42.9 km · Current PI 385 ✓
Section time 2h08m56s
Section 11.7 km · +147 / −1139 m
expected at16:26 cut-off at18:30
in15:48:30
38 min FASTER than expected
Section PI 362
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.