Status
Withdrawn
Last seen at HQ (3rd visit)
On course for 21h53m18s before withdrawal.
Effort today
Current Performance Index: 360
(no iTRA PI) · Current PI: 360
Course profile 100 km · +6,423 m
START HQ A1 HQ W1 A2 W2 HQ HK A3 HQ FINISH
Position overall at each station (1st at the top, 266 at the bottom)
1st266th 131194208211210195169
START HQ A1 HQ W1 A2 W2 HQ HK A3 HQ FINISH
Position overall at each station (1st at the top, 266 at the bottom)
1st266th 131194208211210195169
The dot is this runner.
Aid station schedule
START · 0.0 km ✓
out04:30:00
HQ · 10.0 km ✓
131st overall · 111th male
Section time 2h30m32s · 15:03 /km
Section 10.0 km · +1116 / −123 m
cut-off at07:50
in07:00:32out07:09:25
Dwell 9 minutes.
Section PI 501
A1 · 20.3 km · Current PI 501 ✓
194th overall · 161st male (▼ down 63)
Section time 2h32m20s · 14:47 /km
Section 10.3 km · +323 / −1312 m
cut-off at10:30
in09:41:45out09:46:37
41 min SLOWER than expected
Dwell 5 minutes.
Section PI 368
HQ (2nd visit) · 31.2 km · Current PI 368 ✓
208th overall · 171st male (▼ down 14)
Section time 3h24m16s · 18:44 /km
Section 10.9 km · +1193 / −203 m
cut-off at14:15
in13:10:53out13:37:25
9 min SLOWER than expected
Dwell 27 minutes.
Section PI 399
W1 · 41.1 km · Current PI 399 ✓
211th overall · 170th male (▼ down 3)
Section time 2h30m39s · 15:13 /km
Section 9.9 km · +624 / −684 m
cut-off at16:45
in16:08:04
0 min SLOWER than expected
Section PI 409
A2 · 48.1 km · Current PI 409 ✓
210th overall · 170th male (▲ up 1)
Section time 1h47m03s · 15:18 /km
Section 7.0 km · +302 / −511 m
cut-off at18:35
in17:55:07
6 min FASTER than expected
Section PI 367
W2 · 59.0 km · Current PI 367 ✓
195th overall · 159th male (▲ up 15)
Section time 3h28m20s · 19:07 /km
Section 10.9 km · +720 / −509 m
cut-off at21:40
in21:23:27out21:33:55
Dwell 10 minutes.
Section PI 325
HQ (3rd visit) · 70.5 km · Current PI 325 ✓
169th overall · 134th male (▲ up 26)
Section time 4h49m23s · 24:57 /km
Section 11.6 km · +762 / −704 m
cut-off at01:00
in02:23:18
50 min SLOWER than expected
Section PI 251
HK · 76.7 km
Section 6.2 km · +19 / −901 m
cut-off at02:35
A3 · 80.3 km
Section 3.6 km · +288 / −61 m
cut-off at03:45
HQ (4th visit) · 87.8 km
Section 7.5 km · +930 / −277 m
cut-off at06:40
FINISH · 99.5 km
Section 11.7 km · +147 / −1139 m
cut-off at09:00
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run