← i5 leaderboard

HARNTANASUK, WINAPORN

Race i5 · Bib 5528 · Female · iTRA PI 371
Status
Withdrawn
Last seen at HQ_IN_2
On course for 9h15m52s before withdrawal.
Effort today
Current Performance Index: 403
iTRA PI 371 · running 9% above career level — PB pace
Aid station schedule
START · 0.0 km ✓
out04:30:00
HQ_IN_1 · 10.0 km · Current PI 371 ✓
Section time 2h55m04s
Section 10.0 km · +1116 / −123 m
cut-off at07:50
in07:25:04out07:38:40
12 min SLOWER than expected
Dwell 14 minutes.
Section PI 431 — going harder than career
A1_IN · 20.3 km · Current PI 413 ✓
Section time 2h33m38s
Section 10.3 km · +323 / −1312 m
cut-off at10:30
in10:12:18out10:26:11
24 min SLOWER than expected
Dwell 14 minutes.
Section PI 365 — at career level
HQ_IN_2 · 31.2 km · Current PI 367 ✓
Section time 3h19m41s
Section 10.9 km · +1193 / −203 m
cut-off at14:15
in13:45:52
12 min FASTER than expected
Section PI 408 — at career level
W1 · 41.1 km
Section 9.9 km · +624 / −684 m
cut-off at16:45
A2_IN · 48.1 km
Section 7.0 km · +302 / −511 m
cut-off at18:35
W2_IN · 59.0 km
Section 10.9 km · +720 / −509 m
cut-off at21:40
HQ_IN_3 · 70.5 km
Section 11.6 km · +762 / −704 m
cut-off at01:00
HK · 76.7 km
Section 6.2 km · +19 / −901 m
cut-off at02:35
A3_IN · 80.3 km
Section 3.6 km · +288 / −61 m
cut-off at03:45
HQ_IN_4 · 87.8 km
Section 7.5 km · +930 / −277 m
cut-off at06:40
FINISH · 99.5 km
Section 11.7 km · +147 / −1139 m
cut-off at09:00
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.