START
· 0.0 km
✓
out04:30:00
HQ
· 10.0 km
· Current PI 337 ✓
125th overall · 18th female
Section time 2h29m33s · 14:57 /km
Section 10.0 km · +1116 / −123 m
cut-off at07:50
in06:59:33out07:07:33
29 min FASTER than expected
Dwell 8 minutes.
Section PI 504 — way above career, blow-up risk
A1
· 20.3 km
· Current PI 454 ✓
127th overall · 19th female (▼ down 2)
Section time 2h04m26s · 12:05 /km
Section 10.3 km · +323 / −1312 m
cut-off at10:30
in09:11:59out09:20:12
14 min SLOWER than expected
Dwell 8 minutes.
Section PI 450 — way above career, blow-up risk
HQ (2nd visit)
· 31.2 km
· Current PI 416 ✓
106th overall · 17th female (▲ up 21)
Section time 2h42m27s · 14:54 /km
Section 10.9 km · +1193 / −203 m
cut-off at14:15
in12:02:39out12:20:37
14 min FASTER than expected
Dwell 18 minutes.
Section PI 502 — way above career, blow-up risk
W1
· 41.1 km
· Current PI 452 ✓
95th overall · 17th female (▲ up 11)
Section time 2h00m24s · 12:10 /km
Section 9.9 km · +624 / −684 m
cut-off at16:45
in14:21:01
9 min FASTER than expected
Section PI 511 — way above career, blow-up risk
A2
· 48.1 km
· Current PI 459 ✓
101st overall · 17th female (▼ down 6)
Section time 1h41m57s · 14:34 /km
Section 7.0 km · +302 / −511 m
cut-off at18:35
in16:02:58out16:17:16
5 min SLOWER than expected
Dwell 14 minutes.
Section PI 385 — at career level
W2
· 59.0 km
· Current PI 371 ✓
104th overall · 18th female (▼ down 3)
Section time 2h49m46s · 15:34 /km
Section 10.9 km · +720 / −509 m
cut-off at21:40
in19:07:02out19:26:48
11 min SLOWER than expected
Dwell 20 minutes.
Section PI 399 — going harder than career
HQ (3rd visit)
· 70.5 km
· Current PI 381 ✓
128th overall · 23rd female (▼ down 24)
Section time 3h45m20s · 19:26 /km
Section 11.6 km · +762 / −704 m
cut-off at01:00
in23:12:08out00:12:23
21 min SLOWER than expected
Dwell 60 minutes.
Section PI 322 — at career level
HK
· 76.7 km
· Current PI 327 ✓
134th overall · 26th female (▼ down 6)
Section time 2h02m44s · 19:48 /km
Section 6.2 km · +19 / −901 m
cut-off at02:35
in02:15:07
10 min SLOWER than expected
Section PI 234 — easing off / mild fade
A3
· 80.3 km
Section 3.6 km · +288 / −61 m
cut-off at03:45
HQ (4th visit)
· 87.8 km
Section 7.5 km · +930 / −277 m
cut-off at06:40
FINISH
· 99.5 km
Section 11.7 km · +147 / −1139 m
cut-off at09:00