← i3 leaderboard

YAVICHAI, SUPAKRIT

Race i3 · Bib 3005 · Male · iTRA PI 643
Status
Finished
Total time 8h26m24s
Finished at Sat 08 Aug 15:56:24
Effort today
Current Performance Index: 675
iTRA PI 643 · running at career level (105%)
Aid station schedule
START · 0.0 km ✓
out07:30:00
HQ_IN_1 · 10.0 km · Current PI 643 ✓
Section time 1h41m55s
Section 10.0 km · +1116 / −123 m
expected at09:03 cut-off at10:50
in09:11:55out09:13:21
8 min SLOWER than expected
Dwell 1 minute.
Section PI 666 — at career level
W1 · 19.9 km · Current PI 659 ✓
Section time 1h08m53s
Section 9.9 km · +624 / −684 m
expected at10:28 cut-off at13:30
in10:22:14
6 min FASTER than expected
Section PI 805 — way above career, blow-up risk
A2_IN · 26.9 km · Current PI 756 ✓
Section time 50m45s
Section 7.0 km · +302 / −511 m
expected at11:17 cut-off at15:20
in11:12:59out11:15:59
4 min FASTER than expected
Dwell 3 minutes.
Section PI 697 — going harder than career
W2_IN · 37.8 km · Current PI 681 ✓
Section time 1h26m02s
Section 10.9 km · +720 / −509 m
expected at12:48 cut-off at18:40
in12:42:01out12:45:11
6 min FASTER than expected
Dwell 3 minutes.
Section PI 710 — going harder than career
HQ_IN_2 · 49.4 km · Current PI 690 ✓
Section time 1h44m36s
Section 11.6 km · +762 / −704 m
expected at14:36 cut-off at22:05
in14:29:47out14:32:03
6 min FASTER than expected
Dwell 2 minutes.
Section PI 625 — at career level
FINISH · 61.1 km · Current PI 631 ✓
Section time 1h24m21s
Section 11.7 km · +147 / −1139 m
expected at16:24 cut-off at00:30
in15:56:24
28 min FASTER than expected
Section PI 592 — easing off / mild fade
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.