← i3 leaderboard

PONGERN, PATTARASAK

Race i3 · Bib 3054 · Male · iTRA PI 439
Status
Finished
Total time 15h29m33s
Finished at Sat 08 Aug 22:59:33
Effort today
Current Performance Index: 399
iTRA PI 439 · running 9% below career level — fading
Aid station schedule
START · 0.0 km ✓
out07:30:00
HQ_IN_1 · 10.0 km · Current PI 439 ✓
Section time 2h38m41s
Section 10.0 km · +1116 / −123 m
expected at09:47 cut-off at10:50
in10:08:41out10:43:04
21 min SLOWER than expected
Dwell 34 minutes.
Section PI 428 — at career level
W1 · 19.9 km · Current PI 431 ✓
Section time 2h07m19s
Section 9.9 km · +624 / −684 m
expected at12:40 cut-off at13:30
in12:50:23
9 min SLOWER than expected
Section PI 435 — at career level
A2_IN · 26.9 km · Current PI 436 ✓
Section time 1h23m30s
Section 7.0 km · +302 / −511 m
expected at14:22 cut-off at15:20
in14:13:53out14:40:23
9 min FASTER than expected
Dwell 26 minutes.
Section PI 424 — at career level
W2_IN · 37.8 km · Current PI 428 ✓
Section time 2h33m19s
Section 10.9 km · +720 / −509 m
expected at17:14 cut-off at18:40
in17:13:42out17:30:28
0 min FASTER than expected
Dwell 17 minutes.
Section PI 398 — at career level
HQ_IN_2 · 49.4 km · Current PI 410 ✓
Section time 2h48m21s
Section 11.6 km · +762 / −704 m
expected at20:39 cut-off at22:05
in20:18:49out20:31:46
20 min FASTER than expected
Dwell 13 minutes.
Section PI 388 — easing off / mild fade
FINISH · 61.1 km · Current PI 404 ✓
Section time 2h27m47s
Section 11.7 km · +147 / −1139 m
expected at23:41 cut-off at00:30
in22:59:33
41 min FASTER than expected
Section PI 338 — easing off / mild fade
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.