← i3 leaderboard

PUTNAN, PAYUNG

Race i3 · Bib 3068 · Male · iTRA PI 421
Status
Finished
Total time 12h17m42s
Finished at Sat 08 Aug 19:47:42
Effort today
Current Performance Index: 476
iTRA PI 421 · running 13% above career level — PB pace
Aid station schedule
START · 0.0 km ✓
out07:30:00
HQ_IN_1 · 10.0 km · Current PI 421 ✓
Section time 2h11m05s
Section 10.0 km · +1116 / −123 m
expected at09:53 cut-off at10:50
in09:41:05out09:44:21
12 min FASTER than expected
Dwell 3 minutes.
Section PI 518 — going harder than career
W1 · 19.9 km · Current PI 489 ✓
Section time 1h36m19s
Section 9.9 km · +624 / −684 m
expected at11:21 cut-off at13:30
in11:20:40
0 min FASTER than expected
Section PI 576 — way above career, blow-up risk
A2_IN · 26.9 km · Current PI 529 ✓
Section time 1h19m01s
Section 7.0 km · +302 / −511 m
expected at12:34 cut-off at15:20
in12:39:41out12:53:00
5 min SLOWER than expected
Dwell 13 minutes.
Section PI 448 — at career level
W2_IN · 37.8 km · Current PI 440 ✓
Section time 2h06m39s
Section 10.9 km · +720 / −509 m
expected at15:00 cut-off at18:40
in14:59:39out15:10:45
1 min FASTER than expected
Dwell 11 minutes.
Section PI 482 — going harder than career
HQ_IN_2 · 49.4 km · Current PI 464 ✓
Section time 2h20m51s
Section 11.6 km · +762 / −704 m
expected at17:47 cut-off at22:05
in17:31:36out17:36:55
15 min FASTER than expected
Dwell 5 minutes.
Section PI 464 — at career level
FINISH · 61.1 km · Current PI 451 ✓
Section time 2h10m47s
Section 11.7 km · +147 / −1139 m
expected at20:14 cut-off at00:30
in19:47:42
26 min FASTER than expected
Section PI 382 — at career level
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.