← i3 leaderboard

KAEWSEE, PROMCHOT

Race i3 · Bib 3217 · Male · iTRA PI 341
Status
Finished
Total time 16h35m05s
Finished at Sun 09 Aug 00:05:05
Effort today
Current Performance Index: 350
iTRA PI 341 · running at career level (103%)
Aid station schedule
START · 0.0 km ✓
out07:30:00
HQ_IN_1 · 10.0 km · Current PI 341 ✓
Section time 2h58m23s
Section 10.0 km · +1116 / −123 m
expected at10:26 cut-off at10:50
in10:28:23out10:38:59
1 min SLOWER than expected
Dwell 11 minutes.
Section PI 381 — at career level
W1 · 19.9 km · Current PI 369 ✓
Section time 2h03m03s
Section 9.9 km · +624 / −684 m
expected at12:51 cut-off at13:30
in12:42:02
9 min FASTER than expected
Section PI 450 — way above career, blow-up risk
A2_IN · 26.9 km · Current PI 418 ✓
Section time 1h37m21s
Section 7.0 km · +302 / −511 m
expected at14:19 cut-off at15:20
in14:19:23
0 min FASTER than expected
Section PI 363 — at career level
W2_IN · 37.8 km · Current PI 357 ✓
Section time 2h55m42s
Section 10.9 km · +720 / −509 m
cut-off at18:40
in17:15:05out17:24:39
Dwell 10 minutes.
Section PI 347 — at career level
HQ_IN_2 · 49.4 km · Current PI 346 ✓
Section time 3h08m55s
Section 11.6 km · +762 / −704 m
expected at20:52 cut-off at22:05
in20:33:34out20:51:56
18 min FASTER than expected
Dwell 18 minutes.
Section PI 346 — at career level
FINISH · 61.1 km · Current PI 345 ✓
Section time 3h13m09s
Section 11.7 km · +147 / −1139 m
expected at00:20 cut-off at00:30
in00:05:05
15 min FASTER than expected
Section PI 258 — easing off / mild fade
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.