← i3 leaderboard

LUEANGNIPHAT, ANANTARIT

Race i3 · Bib 3232 · Male · iTRA PI 329
Status
Finished
Total time 16h38m10s
Finished at Sun 09 Aug 00:23:10
Effort today
Current Performance Index: 347
iTRA PI 329 · running 5% above career level — PB pace
Aid station schedule
START · 0.0 km ✓
out07:45:00
HQ_IN_1 · 10.0 km · Current PI 329 ✓
Section time 3h02m28s
Section 10.0 km · +1116 / −123 m
expected at10:48 cut-off at10:50
in10:47:28out10:53:56
0 min FASTER than expected
Dwell 6 minutes.
Section PI 372 — at career level
W1 · 19.9 km · Current PI 359 ✓
Section time 2h07m26s
Section 9.9 km · +624 / −684 m
expected at13:09 cut-off at13:30
in13:01:22
7 min FASTER than expected
Section PI 435 — way above career, blow-up risk
A2_IN · 26.9 km · Current PI 403 ✓
Section time 1h44m35s
Section 7.0 km · +302 / −511 m
expected at14:41 cut-off at15:20
in14:45:57out14:57:03
4 min SLOWER than expected
Dwell 11 minutes.
Section PI 338 — at career level
W2_IN · 37.8 km · Current PI 336 ✓
Section time 3h03m33s
Section 10.9 km · +720 / −509 m
expected at17:49 cut-off at18:40
in18:00:36out18:11:07
10 min SLOWER than expected
Dwell 11 minutes.
Section PI 333 — at career level
HQ_IN_2 · 49.4 km · Current PI 332 ✓
Section time 3h07m29s
Section 11.6 km · +762 / −704 m
expected at21:47 cut-off at22:05
in21:18:36out21:22:12
28 min FASTER than expected
Dwell 4 minutes.
Section PI 349 — at career level
FINISH · 61.1 km · Current PI 343 ✓
Section time 3h00m58s
Section 11.7 km · +147 / −1139 m
expected at00:57 cut-off at00:30
in00:23:10
34 min FASTER than expected
Section PI 276 — easing off / mild fade
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.