Status
Withdrawn
Last seen at A2
On course for 8h01m00s before withdrawal.
Effort today
Current Performance Index: 341
iTRA PI 283 · running 21% above career level — PB pace
Course profile 61 km · +3,670 m
START HQ W1 A2 W2 HQ FINISH
Position overall at each station (1st at the top, 434 at the bottom)
1st434th 365356357
START HQ W1 A2 W2 HQ FINISH
Position overall at each station (1st at the top, 434 at the bottom)
1st434th 365356357
The dot is this runner.
Aid station schedule
START · 0.0 km ✓
out07:30:00
HQ · 10.0 km · Current PI 283 ✓
365th overall · 265th male
Section time 3h19m06s · 19:55 /km
Section 10.0 km · +1116 / −123 m
cut-off at10:50
in10:49:06out11:05:10
14 min FASTER than expected
Dwell 16 minutes.
Section PI 341 — going harder than career
W1 · 19.9 km · Current PI 324 ✓
356th overall · 257th male (▲ up 9)
Section time 2h23m50s · 14:32 /km
Section 9.9 km · +624 / −684 m
cut-off at13:30
in13:29:00
3 min FASTER than expected
Section PI 385 — way above career, blow-up risk
A2 · 26.9 km · Current PI 355 ✓
357th overall · 257th male (▼ down 1)
Section time 2h02m00s · 17:26 /km
Section 7.0 km · +302 / −511 m
cut-off at15:20
in15:31:00
11 min SLOWER than expected
Section PI 290 — at career level
W2 · 37.8 km
Section 10.9 km · +720 / −509 m
cut-off at18:40
HQ (2nd visit) · 49.4 km
Section 11.6 km · +762 / −704 m
cut-off at22:05
FINISH · 61.1 km
Section 11.7 km · +147 / −1139 m
cut-off at00:30
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run