← i3 leaderboard

BOONAIEM, NATTAKIT

Race i3 · Bib 3290 · Male · iTRA PI 282
Status
Withdrawn
Last seen at HQ_OUT_2
On course for 14h33m57s before withdrawal.
Effort today
Current Performance Index: 362
iTRA PI 282 · running 28% above career level — PB pace
Aid station schedule
START · 0.0 km ✓
out07:45:00
HQ_IN_1 · 10.0 km · Current PI 282 ✓
Section time 2h56m34s
Section 10.0 km · +1116 / −123 m
cut-off at10:50
in10:41:34out11:10:58
37 min FASTER than expected
Dwell 29 minutes.
Section PI 385 — way above career, blow-up risk
W1 · 19.9 km · Current PI 354 ✓
Section time 2h04m46s
Section 9.9 km · +624 / −684 m
cut-off at13:30
in13:15:44
6 min FASTER than expected
Section PI 444 — way above career, blow-up risk
A2_IN · 26.9 km · Current PI 396 ✓
Section time 1h50m24s
Section 7.0 km · +302 / −511 m
cut-off at15:20
in15:06:08out15:34:36
12 min SLOWER than expected
Dwell 28 minutes.
Section PI 320 — at career level
W2_IN · 37.8 km · Current PI 309 ✓
Section time 2h52m12s
Section 10.9 km · +720 / −509 m
cut-off at18:40
in18:26:48out18:41:57
0 min SLOWER than expected
Dwell 15 minutes.
Section PI 355 — going harder than career
HQ_IN_2 · 49.4 km · Current PI 333 ✓
Section time 3h24m48s
Section 11.6 km · +762 / −704 m
cut-off at22:05
in22:06:45out22:18:57
6 min FASTER than expected
Dwell 12 minutes.
Section PI 319 — at career level
FINISH · 61.1 km
Section 11.7 km · +147 / −1139 m
cut-off at00:30
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.