← i3 leaderboard

NA CHIANGMAI, PORAMETH

Race i3 · Bib 3348 · Male · (no iTRA PI)
Status
Finished
Total time 15h27m19s
Finished at Sat 08 Aug 23:12:19
Effort today
Current Performance Index: 390
(no iTRA PI) · Current PI: 390
Aid station schedule
START · 0.0 km ✓
out07:45:00
HQ_IN_1 · 10.0 km ✓
Section time 2h29m51s
Section 10.0 km · +1116 / −123 m
cut-off at10:50
in10:14:51out10:24:35
Dwell 10 minutes.
Section PI 453
W1 · 19.9 km · Current PI 453 ✓
Section time 1h50m53s
Section 9.9 km · +624 / −684 m
expected at12:15 cut-off at13:30
in12:15:28
0 min FASTER than expected
Section PI 500
A2_IN · 26.9 km · Current PI 500 ✓
Section time 1h35m02s
Section 7.0 km · +302 / −511 m
expected at13:39 cut-off at15:20
in13:50:30out14:07:21
10 min SLOWER than expected
Dwell 17 minutes.
Section PI 372
W2_IN · 37.8 km · Current PI 372 ✓
Section time 2h43m49s
Section 10.9 km · +720 / −509 m
expected at16:35 cut-off at18:40
in16:51:10out17:12:07
15 min SLOWER than expected
Dwell 21 minutes.
Section PI 373
HQ_IN_2 · 49.4 km · Current PI 373 ✓
Section time 2h50m31s
Section 11.6 km · +762 / −704 m
expected at20:19 cut-off at22:05
in20:02:38out20:23:17
17 min FASTER than expected
Dwell 21 minutes.
Section PI 384
FINISH · 61.1 km · Current PI 384 ✓
Section time 2h49m02s
Section 11.7 km · +147 / −1139 m
expected at23:32 cut-off at00:30
in23:12:19
19 min FASTER than expected
Section PI 295
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.